GS3 › Infrastructure
Revision note: Energy Infrastructure: Power, Coal, Oil, Gas and Renewables
- 3rd largest energy consumer; per capita electricity ~1,400 kWh; installed capacity ~500 GW; non-fossil > 50% of capacity (2025, early NDC achievement)
- Targets: 500 GW non-fossil by 2030; net zero 2070
- Coal: >1 bn t (2023–24); Gondwana; commercial mining 2020; CIL 1975
- Oil: ~85–88% imported; SPR 5.33 MT (Visakhapatnam, Mangaluru, Padur); HELP 2016; E20 reached 2025; gas target 15% by 2030
- Solar ~120 GW (Rajasthan leads), PM-KUSUM 2019, PM Surya Ghar Feb 2024; wind ~50 GW (TN, Gujarat); nuclear ~8.8 GW → 100 GW by 2047; NGHM Jan 2023 (5 MMT by 2030); ISA (Gurugram)
- Discoms: AT&C ~16% (2024); UDAY 2015, RDSS 2021, LPS Rules 2022; national grid 2013
Source: https://upscprep.in/upsc/gs3/infrastructure/energy-infrastructure-power-coal-oil-gas-and-renewables/ · UPSCPrep.in
